![]() ![]() Output: Pile of steel chunks of various sizes, appearing to be cut by laser. The process takes between five and ten minutes, depending on the size of the object being refined. Intense observation and testing have not shown how SCP-914 accomplishes this, and no test object has ever been observed inside SCP-914 during the “refining” process. No energy is lost in the process, and the object appears to be in stasis until the Output Booth door is opened. If the knob is turned to any position and the key wound up, SCP-914 will “refine” the object in the booth. When an object is placed in the Intake Booth, a door slides shut, and a small bell sounds. Below the knob is a large “key” that winds the “mainspring”. The words Rough, Coarse, 1:1, Fine, and Very Fine are positioned at points around the knob. Between them is a copper panel with a large knob with a small arrow attached. Two large booths 3mx2.1mx2.1m (10ftx7ftx7ft) are connected via copper tubes to the main body of SCP-914, labeled “Intake” and “Output”. ![]() Observation and probing have showed no electronic assemblies or any form of power other than the “Mainspring” under the “Selection Panel”. It is incredibly complex, consisting of over eight million moving parts comprised mostly of tin and copper, with some wooden and cloth items observed. Applying the “Rough” setting to explosive materials is not advised.ĭescription: SCP-914 is a large clockwork device weighing several tons and covering an area of eighteen square meters, consisting of screw drives, belts, pulleys, gears, springs and other clockwork. WARNING: At this time, no testing of biological matter is allowed. A full list of tests to be carried out must be given to all guard personnel on duty any deviation from this list will result in termination of testing, forcible removal of personnel from 109-B, and formal discipline at site command’s discretion. Any researchers entering 109-B are to be accompanied by at least one guard for the entirety of testing. SCP-914 is to be kept in research cell 109-B with two guard personnel on duty at all times. Special Containment Procedures: Only personnel who submit a formal request and receive approval from site command may operate 914. One of the least complex sections of SCP-914 in a non-active state
0 Comments
Leave a Reply. |
Details
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |